TOTAL ALIAGA TERMINAL

 

 

Operated by :

Total Türkiye Inc. (http://www.total.com.tr/)

 

Adress:

Total Aliaga Terminali, Karaagaç Koyu, Aliaga IZMIR

 

Phn.:

0 (232) 616 83 03

 

Fax:

0 (232) 616 83 05

 

P.I.C:

Mr. Mustafa AGAN / Terminal Mng. AOH. (232) 324 20 62

 

 

Mobil : (532) 415 76 36

 

 

Mr. Bayram BAL AOH. (232) 617 10 77

Main Office:

Phn. (212) 251 00 94 Fax. (212) 251 44 24 tlx. 25499

 

Location:

38 49 65 N, 26 55 E

 

Anchorage Area:

38 47 50 N, 26 53 E

 

Pilot Meeting:

38 50 00 N, 26 52 E

 

 

Vessels must call pilot station latest 2/3 hrs before arrival on VHF Chn. 16

 

Pilotage:

Compulsory. Provided by Uzmar Co.

 

Tugging:

Compulsory, 1 tug over 1000 GRT, 2 tugs over 5000 GRT.

 

Tanks:

Totally 135000 cbm.

 

Dirty ballas tank:

2600 cbm.

 

Lines distance:

From the jetty to the nearest tank 640 m, farest tank 665 m,

 

 

G.O: 12 in, PLG 10 in, RLG 10 in, PULG 6 in, Ballast 6 in.

 

Loading arms:

8 and 10 in. Arms can reach max. 19 m height.

 

Inspection company:

Caleb - Bret

 

Restrictions:

Insufficent illumination no berthing at night dark. Preferably PULG to be discharged first. No gangway on the jetty.

 

 

PORT OF IZMIR

 

Operated by :

General Directorate of Turkish State Railways (TCDD)(to be privatized) (http://www.tcdd.gov.tr/)

Address :

TCDD Liman Isletmesi Müdürlügü Izmir/ Türkiye

Phone :

(232) 463 22 52

Fax:

(232) 463 22 48

Location:

38 25' 00'' N, 27 04 30 E

B.A. Chart no:

1522

Port of Izmir is situated in the western coast by the Aegean Sea. Izmir is the third largely populated city of Türkiye and it is a business centre. The port has a vast agricultural and industrial hinterland. It is the main port for the Aegean Region's industry and agriculture and it plays a vital function in the country's export. It is on of the fast growing ports and continuously seeking to improve its facilities.

Pilotage:

Pilotage is comoulsory and is provide by the Turkish Maritime Organization (TDI).

Towage:

Towage is provided by the Turkish Maritime Organization. 3 tugs available up to 2500 HP.

Handling Equipment:

The equipment at the port includes 4 containers guatside gantry of 40 tons capacity,9 shore cranes of 3 to 15 tons capacity, 14 mobile cranes of 6 to 30 tons capacity, 7 rubber tyred transainers of 40 tons capacity, 4 reach stackers of 40 tons capacity, 12 container forklifts of 10 to 42 tons capacity, 25 General cargo forklift of 2 to 8 tons capacity, 17 tugmasters, 15 tractor, 1 loader, 22 trailers of 40 tons capasity, 5 trailers of 20 tons capacity, towing tractor.

Floating Craft:

The floating craft at the port comprise floating crane of 100 tons capacity, mooring boats, 2 water bargers.

Storage :

Storage facilities of Izmir consist of 215.940 sqm. open and 23.603 sqm. covered areas including a hazardous cargo warehouse.

Container Terminal :

The container terminal of Izmir has seven berths which haven an alongside depth of 13 m. The total length of the berts is 1050 m. The terminal covers an area of 152.000 s.g.m. and the holding capacity is 7074 TEU. Container operations at the quays are carried out by 6 rubber tyred transtainers and 4 reach stackers of 40 tons capastiy together with 12 container forklifts of up to 42 tons capasity. Reefer facilities for refrigerated containers are also available.

Genaral Cargo Facilities :

There are 12 berts with a total guay length of 1429 m. And with alongside depths ranging from 7 to 10 m. The berts and the yard behind are well eguipped with modern handling facilities.

Bulk Cargo Facilities :

The bert serving the dry bulk traffic has 150m. Length with an alongside dept of 10.5 Grain silos which have 76.000 tons capasity are available and there is conveyor system connection with the quay.

Passenger Facilities :

As Izmir is very close to the tourism and historical places on the Aegean Coast, the port has a substantial passenger traffic. There is a terminal and berths nos 1 and 2 at the port serve the passenger traffic.

Fresh Water :

Fresh water is available from pier ex-valves and by two water bargers of 150 tons capasity. Fresh water is supplied by the Port Administration.

Fuel :

Private suppliers provide fuel by road tankers.

Reception Facilities :

An oily- water separetor system is avaible at the capasity of 35.00 cu.m. Year

Ship Repair :

All types of repairs may be effected at Alay Bey Shipyard owned by Turkish Shipbuilding Industry Inc.

Port Working Hours :

Operational :

Service is provided to vessels everday of the week 24 hours a day, with a rotation of there shifts.

First shift:

08:00-16:30

Second shift :

16:30-00:30

Third Shif:

00:30-08:00

Berthing :

Bert no

Berht Group

Lenght(m)

Depth(m)

1

Passanger

140

-8

2

Passanger

190

-10.5

3

Dry Bulk, Ro/Ro

150

-10.5

4-5

General Cargo

270

-10.5

6

General Cargo

75

-10.5

7-8-9

General Cargo

372

-10.5

10-11-12

General Cargo

348

-10.5

13-14-15-16

Container

600

-13

17-18-19

Container, Ro/Ro

450

-13

20-21-22

General Cargo

364

-13

 

ALIAGA PETKIM TERMINAL

 

Operated by:

Petkim, Petroleum Chemical General Management Of Türkiye (http://www.petkim.com.tr/)

Phone:

(232) 616 32 40 - 616 12 40 / 8 lines

Extention numbers:

Pilot. 2323 or 3124, Transfer office. 4223 or 3120,Harbour office. 3791 or 2323, Surveyor 3763,Custom. 2850

Fax:

(232) 616 12 48

Tlx:

51706 - 51707 - 51709

Pilot Phn.:

(232) 616 23 23

Floating Craft:

2 mooring boat, 1 tug boat (2400 BHP)

F.W:

Available

Bunker:

Through suppliers (permission to be taken from establisment).

Tugging:

1 tug over 2000 GRT, 2 tugs over 5000 GRT

Handling :

At tanker berths, fixed line is assigned. Mobile cranes are available at gen’l cargo jetty. 2x3 T cranes on rail available on jetty 3.

 

HABAS PIER (MERTAS)

 

Operated By:

Habas Liman Isletmeleri A.S. (http://www.habas.com.tr/)

Location:

38 45 N; 26’55’ E (Eastern Side of Çukurova Pier)

Phone:

(232) 625 11 81 - 625 11 71

Fax :

(232) 625 11 72

Main Office Tlx:

24024 sgaz TR ( Istanbul)

Main Office Phone:

(212) 250 42 00 - 250 13 90 - 254 68 00 / 6 Lines - 235 98 00 / 6 Lines

Main Office Fax:

(212) 253 96 87

Working Hours:

24 hours

Pilotage:

Compulsory, Provided by Uzmar Co.

Tugging :

1 tug over 2000 GRT, 2 tugs over 5000 GRT

F.W / Bunker:

Through suppliers

 

 

Hardling:

Mostly by vessels’ own gear.

B.A. Chart :

1618

 

EGE FERTILIZER PIER

 

Operated by:

EGE FERTILIZERS S.A.

Location :

38 45 N ,26 55 E

Phone :

(232) 625 12 56 (6 Lines)

Fax :

(232) 625 12 45

Berth :

123 m, draft 10-14 m, max. DWT 50000

B.A. CHART :

1618

Cargoes

Connection

Average Rate

Anhyd ammonia

8 inches

350 mt/h

Sulphur

4-6 inches

100 mt/h

P. Acid

4-6 inches

100 mt/h

 

G. Cargo / Bulk :

3000 MT/DAY

Shore Cranes :

Grabs/Hoppers and Conveyors For Bulk Urea 15 T

Working Hours :

24 hrs.

F.W :

Available

Bunker :

Through supplier

Pilotage :

Compulsory, provided by Uzmar Co.

Tugging :

1 tug over 2000 GT, 2 tugs over 5000 GT

 

Storages:

Width (m)

Lenght (m)

Height

Semi-covered :

86.4

93.8

6

Covered :

40.5

60.4

11

Open :

100

135

 

4 Grain Silos 5000 mt each

 

NEMTAS PIER

 

Operated By:

Nemrut Liman Isletmeleri A.S. (http://www.nemtas.com/)

Location:

38 45 N, 26 55 E

Address:

Nemrut Limani, ÇakmakliKöyü P.K. 47 Aliaga, IZMIR

Main Office Address:

Çakmakli Köyü, Kendirci Mevkii P.K. 47 AliagaIZMIR

Telephone:

(232) 441 55 66

Fax:

(232) 441 94 62

Telex:

25 645 IdÇ TR, 51124 NMST TR

E-Mail:

NemtasNemrut@service.Raksnet.com.Tr

Rates:

Scrap metal 3000 - 7000 mt/day

Storage Facilities:

Open Area

Shore cranes:

2 x 12.5 T SWL

Working hours:

24 Hrs.

F.W/Bunker:

Through suppliers

Pilotage:

Compulsory, provided by Uzmar Co.

Tugging:

1 tug over 2000 GT, 2 tugs over 5000 GT

 

TUPRAS ALIAGA REFINERY

 

Operated By:

Tüpras Aliaga Refinery (http://www.tupras.com.tr/)

Address:

Aliaga Rafinerisi Iskelesi, Aliaga, Izmir, Türkiye

Telephone:

(232) 616 12 50 - 616 10 92

Fax:

(232) 616 12 49 - 616 22 49

B.A. Chart No:

1618

Location:

38 45 N; 26 53 E

Incoming tankers discharge at a “T” type oil jetty just south of the Tasli Burnu Light. The jetty runs paralel to the coastline and is approximately situated 39 49 30 N, 26 57 30 E. The outer arm of the jetty, 317 m long, is designed for crude oil tankers 100.000 DWT on the outer side and for tankers of 25.000 DWT on the inner. The outer SE arm is designed for product tankers up to 22.000 DWT an the inner berth for small tankers of up to 5.000 DWT.

The crude oil berth is roughly in the center of the NW arm and has 4 loading arms. The jetty is protected by 4 pivotal concrete buffers. The product berth is similarly in the center of the arm and is equipped with flexible hoses.

Crude oil pumping rate is about 3.000 Tons/hour

Vessels with drafts up to 16.5 meters are allowed to berth at the crude oil wharf.

Fresh water supplied by refinery by pipeline and bunkers and provisions are available through suppliers.

Nature of sea bottom:

Sand

To meet the increasing petroleum products consumption of Türkiye the construction of Izmir Refinery located on the Aegean coast near Aliaga in Izmir began in 1968. While the Refinery capacity was 3.0 millions tons/year at the start-up in 1972, the capacity was increased gradually by Debottlenecking Project and an Expansion Project after which the refinery capacity reached to 10.0 millions tons in 1987.

The refinery has two atmospheric distillation and vacuum distillation units, kerosene/diesel desulphurization units, sulphur recovery unit, one unifener / reformer unit,naptha and kero swetening units as well as utility units. Izmir Refinery has also the single lube oil complex with a capacity of 300.000 tons/year in Türkiye.

Izmir Refinery is the second largest refinery of TÜPRAS and Türkiye. Curude oil and intermediate product processing capacities are given below:

36.000 m3/day Crude Units
12.000 m3/day Vacuum Units
2.400 m3/day FCC Unit
1.560 m3/day Reformer (Octane Enhancement) Unit
2.880 m3/day Desulphurizer Units (Sulphur Removal)
2.600 m3/day Hydrocraker unit
3.000 m3/day Visbreaker Unit
98 m3/day Sulphur Recovery Units in addition to above units;
2x600 m3/day Industrial Waste Water Treatment Units
1.950 m3/day Sewage Water Tretment Unit.

Pilotage:

Compulsory, provided by Tüpras.

Tugging:

1 tug over 500 GT, 2 tugs over 5000 GT, 3 tugs over 25000 GT, 4 tugs over 50000 GT.

 

The establisment has two tugs with 2400 HP.

 

CUKUROVA PIER

 

Operated By:

Çukurova Liman Isletmeleri

Location:

38 46 N, 26 55 E

Phone:

(232) 625 13 94/95

Rates:

Scrap metal 3000-5000 mt/day

Shore Cranes:

Usually discharging, by ships cranes.

Working Hours:

24 hrs

F.W / Bunkers:

Through suppliers

Pilotage:

Compulsory, Provided by Uzmar Co.

Tugging:

1 tug over 2000 GRT,

 

2 tugs over 5000 GRT.